ARDEX EP Fills and repairs cracks in screeds and concrete; Water, frost, weather and chemical resistant; Can receive loads after 24 hours. Images and. ARDEX EP TM. Substrate Preparation. Epoxy Primer. Two-component epoxy preparation material. Primer for concrete and non-porous substrates such as. ARDEX EP is a product in the Hydraulic Cement Underlayment – Primer/ Bonding Agent category. Find submittal-ready datasheets, SDS, specs, ICC-ES.

| Author: | Zulkigor Tojas |
| Country: | Equatorial Guinea |
| Language: | English (Spanish) |
| Genre: | Marketing |
| Published (Last): | 8 October 2013 |
| Pages: | 150 |
| PDF File Size: | 5.4 Mb |
| ePub File Size: | 12.11 Mb |
| ISBN: | 868-2-99093-401-8 |
| Downloads: | 73320 |
| Price: | Free* [*Free Regsitration Required] |
| Uploader: | Kagor |
Once hardened, the resin is water, frost, weather and chemical resistant. Material Requirement With surface application approximately. The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage.

The calculator below will tell you how large an area a unit of 2000 selected grout will cover, based on the dimensions that you supply. Simply enter the required figures in the boxes below and view the results in the results box.

All tile and joint dimensions are rounded up to the nearest number no decimal points. ARDEX continue to offer unbeatable quality and cost effective solutions for building projects covering all sectors of business and commerce, such as retail outlets, leisure centres, health authorities, transport premises, art and educational institutions.
Information Technical Data Downloads.
Ready to receive loads and levelling and smoothing compounds after 24 hours Resistant to water, frost, weather and chemicals Easily mixed and can 2000 poured directly into cracks, or applied with a roller to the surface Unit Size Available: Refer to product datasheet. Can be subjected to chemical loads after approx.
ARDEX EP – Solvent-Free, Low Viscosity Epoxy Resin
Result The number of kg required The number of units required for your project The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage. Result The number of kg required The number of kg bags required for your project The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage.
Result The number of kg required The number of kg bags required for your project The amount of kg sand needs to be added The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage.

Select 22000 calculator below will tell you how large an area a unit of the selected grout will cover, based on the dimensions that you supply. Tile Dimensions Length mm Breadth mm.
Joint Dimensions Width mm Depth mm. Results The number of kg required per square metre Therefore: The number of kg unit s required for your project The calculation above indicates the approximate number of units required, and does not allow for ardwx conditions or wastage. Select your radius 10 mi 25 mi 50 mi mi mi mi.
